top of page

Nationwide coverage | Compliance-led | Contact us today on 02921 661 020

47fe52_22a5e2565c9d42dd82cfedfeebdf0b36~mv2.avif
charge_13930555.png

Quidos Generate Solar

Commercial Solar built around your site

See how much commercial solar could save your business

Receive a free initial feasibility report showing estimated system size, annual generation, onsite consumption, annual savings and your capital purchase and PPA options.

Free initial assessment

Initial results within 5 working days

No obligation

17.jpg

42.7 MW

In development

Two routes

Capital purchase or PPA

Independent

Design validation

CHOOSE THE RIGHT COMMERCIAL ROUTE

Capital Purchase or Solar PPA

We show both options where they are suitable, using the same site and consumption assumptions.

Capital purchase

OWN THE SYSTEM

Best for businesses that want to invest capital and retain the full value of the electricity generated.

You retain the long-term energy benefit

Savings, payback and return on investment are modelled

You fund and own the solar installation

Warranties and maintenance requirements are set out clearly

PRESERVE YOUR CAPITAL

Solar PPA

Best for suitable businesses that want solar without paying the installation cost upfront.

A third-party funder normally owns the system

You buy the solar electricity at an agreed rate

Maintenance is normally included for the contract term

Price, term, indexation and export treatment are transparent

PPA availability and terms are subject to technical feasibility, electricity usage, credit approval and funder criteria.

A USEFUL DELIVERABLE, NOT JUST A SALES CALL

What your feasibility report will show

02 Feasibility Report.webp

The report is designed to give decision-makers a clear first view of the opportunity, the assumptions used and the next work needed to turn the estimate into a firm proposal.

01 Estimated system size

Based on usable roof area, layout constraints and sensible design allowances.

02 Annual solar generation

A site-specific estimate using appropriate yield and loss assumptions.

03 Likely onsite consumption

The proportion likely to be used behind the meter, with export shown separately.

04 Annual and lifetime savings

A transparent view of the financial case with key assumptions stated.

05 Capital purchase and PPA options

A like-for-like commercial comparison where both routes are available.

06 Estimated carbon reduction

An estimate of avoided grid electricity emissions using a stated methodology.

229424569_m.jpg

A healthy
nation

speaks
volumes

Nationwide Network for Exceptional Service

Quidos Protect's commitment to excellence sets us apart. With a focus on compliance and aftercare, we have redefined the standards for national network services. Our comprehensive approach ensures operational efficiency and customer satisfaction at every corner of the United Kingdom.

FROM FIRST REVIEW TO INSTALLED SYSTEM

A clear route from feasibility to delivery

01 Initial Review.jpg

01 Initial review

We review the site, consumption and operating profile to identify the likely opportunity.

02 Feasibility Report.webp

02 Feasibility report

You receive the estimated system, generation, onsite use, saving and funding routes.

03 Technical Validation.webp

03 Technical validation

Roof, electrical infrastructure, structural requirements and grid position are confirmed.

04 Proposal and Delivery.webp

04 Proposal and delivery

We agree the commercial model, final design, programme, installation and ongoing support.

Preffered Route

YOUR STARTING POINT

Find out what your roof could save you

Send us a few site details. We will review the opportunity and let you know what else, if anything, is needed to prepare the initial feasibility report.

Free initial desktop assessment

No obligation to proceed

No hard sell

By submitting this form, you agree to be contacted about this request. Privacy wording and a policy link should be added before publication.

your in trusted hands..

bottom of page